At this point I don't have any detail here. If you want step by
step details check out Dan Checkoway's RV-7 Site.
I may put some detail here later but for now I am only putting down things that are slightly
unique to my plane. They can be seen on my Tips page.
| Date | Description | Hours |
| 05/24/01 | Inventoried Empinage Kit | 2.00 |
| 05/25/01 | Inventoried Tool | 2.00 |
| 05/25/01 | Rear Spar Drill to Skin of H.S. | 1.00 |
| 05/27/01 | Rear Spar | 4.00 |
| 05/28/01 | Build "H-Frame" Jig | 1.50 |
| 05/30/01 | Front Spar | 4.50 |
| 06/02/01 | Rear Spar to Rib Assembly | 2.00 |
| 06/03/01 | Horizontal Stabilizer Skeleton | 4.00 |
| 06/04/01 | Prime Rear Spar Extrusions | 1.00 |
| 06/05/01 | Assemble Rear Spar and Prime Front Spar Extrusions | 4.00 |
| 06/07/01 | Rivet Front Spar to Rear Spar & Ribs, Make Jig Brackets | 3.50 |
| 06/10/01 | Work on "H-Frame" Jig | 3.00 |
| 06/11/01 | Finish Jig and Skin Right Horizontal Stabilizer | 5.50 |
| 06/12/01 | Skin Left Horizontal Stabilizer | 1.50 |
| 06/13/01 | Finish Riveting H.S. and Start on Vertical Stabilizer | 4.00 |
| 06/16/01 | Vertical Stabilizer Frame | 2.00 |
| 06/17/01 | Finish V.S. Skeleton, Skin V.S. and Finish it up | 5.75 |
| 06/19/01 | Cut Rudder Skin Stiffeners | 2.00 |
| 06/20/01 | Install Skin Stiffeners in Rudder | 3.50 |
| 06/21/01 | Rudder Skeleton Prep | 2.00 |
| 06/22/01 | Finish Prep, Drill Skin to Ribs, Build V-Block Holder | 5.00 |
| 06/24/01 | Finish Rudder | 5.00 |
| 07/03/01 | Layout Skin Stiffener Holes | 1.00 |
| 07/14/01 | Fabricate Skin Stiffeners | 4.00 |
| 07/15/01 | Build Right Elevator Skeleton | 4.25 |
| 07/16/01 | Right Elevator skeleton and Skin | 5.00 |
| 07/16/01 | Finish Right Elevator | 2.00 |
| 08/07/01 | Install Skin Stiffeners in Left Elevator, Build Skeleton | 10.00 |
| 08/14/01 | Work on Trim Servo for Elevator | 2.00 |
| 08/15/01 | Elevator Trim Bracket | 1.50 |
| 08/17/01 | Elevator Trim Bracket | 0.50 |
| 08/18/01 | Finish Left Elevator | 10.00 |
| 08/18/01 | Improve Fit of Servo cover plate on elevator | 2.00 |
| 08/18/01 | Total | 115.00 |
|---|
| Date | Description | Hours |
| 08/18/01 | Inventory Wing Kit | 1.50
|
| 08/22/01 | Layout Left Spar | 0.50
|
| 08/24/01 | Attach Platenuts to Left Wing Spar | 3.50
|
| 80/26/01 | Attach Platenuts to Right Wing Spar | 3.50
|
| 08/26/01 | Tie Down Brackets | 0.50
|
| 08/28/01 | Make w-726 Tie Down Spacers | 1.00
|
| 09/01/01 | Finsh Tie Down Assembly | 5.00
|
| 09/02/01 | Assemble Tie Downs To Spars | 1.00
|
| 09/03/01 | Prep Rear Spar Pieces | 3.00
|
| 09/07/01 | Assemble Rear Spars | 3.50
|
| 09/08/01 | Prep Wing Ribs | 6.00
|
| 09/09/01 | Assemble Left Wing Ribs, Build Wing Jig | 5.00
|
| 09/10/01 | Rivet Together Left Wing Skeleton | 4.00
|
| 09/13/01 | Finsh Left wing main skeleton and begin skinning in Jig | 2.50
|
| 09/14/01 | Plan Electrical and fit outboard Top wing skin | 2.25
|
| 09/16/01 | Drill Top Skins and Fit leading edge and begin Fuel Tank | 7.00
|
| 09/18/01 | Left Fuel Tank Prep | 4.75
|
| 09/19/01 | Fit Fuel Tank Skin | 3.00
|
| 09/22/01 | Left Fuel Tank | 5.00
|
| 09/23/01 | Left Fuel Tank inbourd Ribs | 3.00
|
| 09/24/01 | Drill Fuel Cap to tank Skin left | 0.50
|
| 09/29/01 | Debur and Dimple left Fuel Tank | 2.25
|
| 09/30/01 | Prepare Left Fuel Tank Skin | 1.50
|
| 10/07/01 | Seal Left Tank Stiffeners, Drain, Fuel Cap Flange | 4.00
|
| 10/14/01 | Sealed oneTank Rib | 3.00
|
| 10/25/01 | Sealed Two Tank Ribs | 3.00
|
| 11/07/01 | Sealed Two Tank Ribs | 2.00
|
| 12/02/01 | Sealed Two outer Ribs, Plumb fuel pickup and Vent Line | 8.00
|
| 12/09/01 | Install rear baffle to complete left fuel tank | 3.50
|
| 12/09/01 | Left leading edge, drill, debur, dimple | 3.50
|
| >12/12/01 | Frivet leading edge | 2.50
|
| 12/16/01 | Install Left Langing light | 6.00
|
| 12/23/01 | Install Pitot Tube Bracket | 3.00
|
| 12/24/01 | Begin Leading Edge Install | 1.50
|
| 12/26/02 | Finish Leadign Edge Install, Prep Skeleton Ribs | 3.50
|
| 12/29/01 | Rivet Top Main Skins and Prep bottom Skins & Skeleton | 9.00
|
| 12/30/01 | Install Aileron Brackets, Flap & Ail Supports, Bottom Skin | 4.50
|
| 12/31/01 | Initiate Left tank leak test | 1.00
|
| 01/05/02 | Start Left Aileron | 7.50
|
| 01/06/02 | Finish Left Aileron | 3.00
|
| 01/06/02 | Start Left Flap | 3.00
|
| 01/08/02 | Prep Flap to Rivet | 2.00
|
| 01/09/02 | Begin Riveting Left Flap | 3.00
|
| 01/14/02 | Install Flap Actuator rod end bearing nut plate | 0.30
|
| 01/26/02 | Finish Left Flap | 3.00
|
| 01/26/02 | Install Left Aileron | 1.00
|
| 01/26/02 | Build Aileron Push Tubes | 3.00
|
| 02/02/02 | Install Pitot Tube and wiring | 3.00
|
| 02/04/02 | Rivet Bottom Skins | 4.00
|
| 02/09/02 | Rivet Bottom Skins | 3.50
|
| 02/10/02 | Install One wing bottom Access cover | 0.50
|
| 02/10/02 | Install Two access covers, Install Flap, Finsh riveting skin | 6.00
|
| 03/16/02 | Right Wing Skeleton Assembly | 2.00
|
| 03/30/02 | Finish Skeleton Assembly, drill top Skins | 4.00
|
| 04/11/02 | Hang in Jig and fit Leading edge | 2.50
|
| 05/03/02 | Start right Tank, Fit to Wing | 4.00
|
| 05/04/02 | Build Trap Doors and Prep tank Ribs | 8.00
|
| 05/05/02 | Right Fuel Tank Flop Tube | 2.50
|
| 05/18/02 | Finish Prep on Right tank | 3.00
|
| 05/27/02 | Seal Right Tank Stiffeners, 8 | 2.00
|
| 05/30/02 | Seal Right Tank Stiffeners, 4 | 1.50
|
| 06/06/02 | Seal Two Ribs | 3.50
|
| 06/23/02 | Finish Sealing Ribs | 6.00
|
| 06/24/02 | Seal Baffle | 6.00
|
| 06/29/02 | Open Tank to install access plate, Start Leading Edge | 5.00
|
| 06/30/02 | Finish Right Leading Edge | 6.00
|
| 07/04/02 | Fix right tank leaks and add access panel | 2.50
|
| 07/04/02 | Main Wing skin Prep, skeleton prep | 4.00
|
| 07/06/02 | Main Skin Prep | 8.00
|
| 07/14/02 | Rivet Leading Edge to Spar & attach tank | 4.00
|
| 07/16/02 | Rivet Top main Skins | 1.50
|
| 07/17/02 | Backrivet Right Aileron Skin | 3.00
|
| 07/26/02 | Finish Riveting Top main Skins | 2.00
|
| 07/21/02 | Aileron Skeleton | 2.50
|
| 07/29/02 | Remove Stiffeners and Install on New skin | 2.00
|
| 07/31/02 | Assemble Aileron | 7.00
|
| 08/03/02 | Right Flap Construction | 8.00
|
| 08/04/02 | Mount Flat and Aileron Fairings, install aileron | 6.00
|
| 08/04/02 | Take down wing Jig | 0.50
|
| 08/15/02 | Wire Wing For Navaid Servo and Tip antena | 1.50
|
| 08/18/02 | Rivet Bottom Skins | 0.50
|
| 08/18/02 | Total | |
|---|